Before you subscribe or commission us, take a look at how we actually write.
This is a real sample of our clause-based specifications — sharp, compliant, and ready for site.
The pack includes:
– Clause A03 – Foundation Wall (Cavity with Lean Mix Fill)
– Clause B01 – External Cavity Wall (Full Fill)
– Clause F10 – Solid Ground Floor Construction
– Clause L03 – Playground Resurfacing
– Clause D03 – Below-Ground Drainage
– A short extract from our Preliminaries section
Each file is formatted in Word (.docx), fully editable, and built to SpecWorks.uk specification standards.
Want to see how we really write? Just enter your email below and we will send it straight to you.
We do not use mailing lists or send spam. You will get the pack and occasional updates about new content that is it.
Clause D03 – Below-Ground Drainage (Foul and Surface Water)
Install new drainage using uPVC pipes to BS EN 1401-1, laid on and surrounded with selected granular material, min. 100mm below and above barrel. Minimum gradients to comply with Part H. All pipes to be bedded true to line and level, with access chambers provided at all changes in direction, pipe size, or junction. Use 450mm polypropylene inspection chambers for depths up to 1.2m. Backfill and compact in layers. Existing connections to be exposed and confirmed before works commence. System to be air tested to 100mm water gauge for minimum 5 minutes. Reinstatement to match existing surfaces with cold-lay tarmac or slabs on sand/cement bed.
Written for real-world use, not just compliance.
This is not a showcase — it is a working sample. Every clause in the pack reflects the way we actually write: clear, clause-based, and ready for real projects. If you are tired of over-complicated spec software or vague template packs, start here. See the work, test the detail, and decide for yourself if SpecWorks.uk f meets your requirements