Clause collection 02 / Groundworks and Substructure

Once below-ground work is covered,the chance to check it has gone.

Groundworks may look straightforward on a drawing. Yet excavation limits, formation, unsuitable material, groundwater, filling, compaction and inspection all affect what the contractor prices. The current A series contains 24 numbered clauses, supported by AA00 General Groundworks.

Register interest
Section
A series
Status
24 clauses / Preparing for publication
Emphasis
Scope, formation and inspection

01 / Where difficulty begins

The drawing shows the intended foundation. It does not define every allowance beneath it.

Two contractors can price the same foundation plan and still include materially different groundworks.

The tender information must distinguish the work included in the base price from conditions that require measurement, reporting or further instruction. Otherwise, formation, unsuitable material, disposal, imported fill and groundwater become assumptions rather than common pricing information.

Below-ground omissions are unforgiving. They are difficult to verify later and expensive to correct once foundations, slabs and finishes have covered the evidence.

02 / Where assumptions gather

The important differences are often hidden inside the price.

01

Ground conditions

Formation, bearing, groundwater and unsuitable material need a clear route for inspection, reporting and instruction rather than an improvised decision on site.

02

Pricing basis

Excavation, disposal, imported fill and additional work must be separated clearly enough for tenderers to price the same scope.

03

Work before covering

Compaction, reinforcement, damp protection and substructure work need defined checks while they remain visible.

03 / The practical answer

Make the hidden work visible in the specification.

The A series follows the work from site clearance and excavation through foundations, substructure and ground floors.

Each clause defines the operation, materials, preparation, critical workmanship, interfaces and inspection requirements that affect what is priced and built. Project-specific decisions remain visible, ready to be completed by the professional preparing the specification rather than buried inside generic wording.

04 / Within the collection

24 clauses covering the work from clearance to ground floor level.

The collection currently contains 24 numbered A-series clauses, supported by AA00 General Groundworks. It remains under publication review while the clauses and supporting material are checked as a complete working collection.