Sample clauses

Do the clauses define the work?Judge for yourself.

Every clause library can promise to save time. The real test is whether its wording defines the work, exposes necessary decisions and helps tenderers price on the same basis. Download three complete clauses and judge them for yourself.

Download the sample pack PDF · 18 pages · Three complete clauses

01 / Inside the pack

A polished promise proves very little.

The sample pack contains complete clauses, not carefully selected extracts.

  • R108 Selective Demolition and Removal of Existing Construction
  • A04 Filling, Compaction and Made Ground Preparation
  • B04 External Wall Cavity Trays, Stop Ends and Weep Vents
  • Notes on project selection, adaptation and permitted use

No form, sales call or email gate. Read the clauses in your own time and decide whether they would improve the way you prepare specifications.

Download the PDF

02 / Abridged extract

Forming an opening is not one line of work.

“Form opening and make good” leaves the tenderer to decide what support, cutting, lintel work, reinstatement and finishing have been included.

SPECWORKS CLAUSE EXTRACTR SERIES

FORMING OPENING IN EXISTING MASONRY WALL

Preliminary checks: Confirm the location, finished opening size, wall thickness, construction and loadbearing status before starting. Check for concealed services and report discrepancies affecting the work.

Stability: Provide temporary support sufficient to maintain the stability of the wall and supported construction throughout the operation.

Formation: Carefully cut the opening to avoid unnecessary disturbance to retained masonry and adjacent finishes. Install the specified lintel with the required end bearing onto sound masonry.

Making good: Form jambs, reveals and soffit accurately. Reinstate disturbed fire stopping, acoustic construction, plaster, skirtings and adjacent finishes to maintain the performance and appearance of the retained construction.

Abridged for the website. Published clauses include the full requirements and project-selection information.

03 / The sample range

Different operations. One practical test.

01

Selective demolition

Scope, protection, temporary stability, careful removal, retained materials and disposal.

02

Filling and compaction

Material selection, receiving formation, controlled placement, testing and completion standards.

03

Cavity trays and weep vents

Locations, materials, interfaces, workmanship, inspection and common specification options.

Start with the evidence

Read the clauses before deciding.

Download the complete sample pack. No registration and no sales call required.

Download the sample pack